EstimatingHow-toOriginal template

Handyman estimate template with a worked example

Copy a handyman estimate template with labor, materials, and exclusions. Follow a worked cabinet repair example from first scope to approved revision.

How we test · Advertising disclosure

On this page · 3 sections

Open the editable handyman estimate (.txt). Copy it into your editor and replace each blank with the details of your job.

Start with the scope

Write a sentence that identifies the work, where it happens and the agreed result. For example, “Replace six cabinet pulls and adjust two misaligned kitchen doors.” Add the assumptions that make the estimate work, such as access to the kitchen and compatibility with the existing mounting holes. List exclusions where the client can see them before approval.

If the customer buys a part, record whose responsibility it is to supply it and what happens if the fit differs. Separate optional work from the subtotal for the work they asked you to do.

Worked example: replace cabinet hardware

The prices below are fictional and illustrate the calculation.

Item Basis Estimated amount
Remove hardware, fit six pulls and adjust two doors 2 hours × $70 $140
Compatible cabinet pulls 6 × $8 $48
Fasteners One allowance $12
Revision 1 subtotal $200

The scope excludes damaged hinges, drilling for a different hole spacing, and refinishing. Before work starts, the customer asks you to add two compatible replacement hinges. You update the estimate and list the change.

Revision 2 change Basis Addition
Replacement hinges 2 × $9 $18
Fit and align hinges 0.5 hour × $70 $35
Total addition $53

The updated subtotal is $253. Label the two versions clearly and record which version the customer approved and when. Keep the original scope so both of you can reconstruct the change.

Before converting it to an invoice

  1. Match the invoice to the approved estimate revision.
  2. Check which work was completed and which extras were separately approved.
  3. Carry over any recorded payments and verify the balance.

Keep the estimate and invoice as separate records. The cleaning invoice example demonstrates how an invoice can show a payment already received.

Sources and changes

Common questions

Where do I list materials the customer provides?

Record them under customer responsibilities. Include any fit, size or availability assumption affecting the start date or scope.

What should I carry from the estimate to the invoice?

Use the accepted revision and reference. Copy the completed work, separately approved extras and any payments received, then verify the balance against your payment record.